Case Studies

Before and after results.

Examples of bottleneck, waste, downtime, and documentation improvements.

Case Studies

Metric-focused improvement stories

Representative examples of how MARAD frames operational challenges, measures change, and communicates business impact.

Line availability

Packaging Line Throughput Recovery

Before

62%

After

79%

Challenge: Frequent micro-stoppages, inconsistent handoffs, and weak downtime records.

Outcome: Introduced downtime coding, shift handover discipline, and operator checks that clarified the real causes of lost time.

Batch waste rate

Food Processing Waste Control

Before

14%

After

8%

Challenge: Material overuse, rework, and quality checks happening too late in the process.

Outcome: Reworked process controls, inspection points, and batch records to reduce avoidable loss and improve traceability.

Core records active

SME Factory Documentation Sprint

Before

3

After

11

Challenge: Production decisions depended on memory, informal reports, and inconsistent supervision routines.

Outcome: Built SOPs, daily scorecards, maintenance logs, and quality checklists that management could review weekly.

Manufacturing Bottleneck Review

Book A Manufacturing Bottleneck Review

Let's improve your factory performance.

Start Your Review

Share the factory challenge you want diagnosed.

The contact page includes the full Manufacturing Bottleneck Review form, so your request reaches us with the details needed for an initial assessment.

Request Review